Corporate &
Office Installs.
Tenant improvement buildouts, headquarters environments, and branded office spaces. We work under GC-managed schedules, accommodate phased delivery in occupied buildings, and bring the documentation rigor that corporate procurement requires.
Project phases
Pre-Construction Review
We review the wallcovering specification, floor plans, and substrate notes before mobilizing. For tenant improvement projects, we coordinate with the GC to understand the construction schedule and identify our installation window within the critical path.
Substrate Assessment and Preparation
New drywall in commercial construction requires a primer coat compatible with the adhesive system and the wallcovering backing. We assess surface flatness, joint compound cure, and moisture content before applying primer. Skim coating is performed where surface irregularities would telegraph through the finished wallcovering.
Material Staging and Layout
Wallcovering rolls are staged and acclimated to the building environment before installation begins. We calculate cut lists from the floor plan, plan seam placement to avoid high-visibility sightlines such as conference room focal walls and reception areas, and confirm pattern drops before the first strip is cut.
Installation
Installation proceeds room by room or zone by zone per the phasing schedule. In occupied buildings, we work after hours or in sections, containing dust and adhesive odor from adjacent occupied spaces. All seams are rolled and inspected before moving to the next surface.
Inspection and Punch
Post-installation inspection covers seam integrity, pattern alignment, trim cuts at outlets and fixtures, and surface cleanliness. We provide a written punch list completion record and retain material samples for future touch-up reference where the specification permits.
Corporate office wallcovering installation in progress
Occupied building considerations
The majority of corporate wallcovering work in Minneapolis takes place in buildings that are partially or fully occupied. Tenant improvement projects on floors above active tenants, phased renovations in operating headquarters, and common-area refreshes in occupied office towers all require a contractor who understands building access protocols.
We coordinate elevator reservations, loading dock scheduling, and after-hours access with building management before mobilizing. Adhesive products used in occupied environments are selected for low-VOC content where the specification allows. Our crew carries building access credentials and complies with each building's specific contractor requirements.
Where we deliver this service
Corporate and office wallcovering installation is available throughout the Minneapolis metro, including:
Submit your
project brief.
Include the floor count, approximate square footage, occupancy status during install, and your target completion date. We respond within 24 hours.
Armatage Elite Commercial Wallpapering
1015 Glenwood Ave
Minneapolis, MN 55405
Mon–Sun: 7:00 AM–10:00 PM